Hi all.
OK, the plan has changed!
There can be a single timeswitch to control power from main isolator to DB.
What is available out there, that can handle this load?
Cheers
Dave
PS
It also needs to have a manual override to stich the timeswitch off!
Hi,
I'm just about to install a 3 phase 8 Way DB that will feed 4 x 9Kw 3 phase immersion elements.
The customer has asked for each element to be fitted with a time switch.
The elements will be controlled by a 20amp Rotary Isolation switch.
What can I install, and where should it be...