  1. Murdoch

    Selv fan not enough

    Is the gap under the door 6 mm minimum? How long is the duct run?
  2. Murdoch

    BT Open Reach - rant time

    I meant to update this So the email was from somebody at Open Reach We only found out this when the customer and I started a new call to move the master socket with Sky who then booked a visit with OR And later the original OR person emailed the customer with an apology for the slow response...
  3. Murdoch

    Electric test fail.

    Needs to be investigated properly before making any decisions. Could be 3 loose connections anywhere on the ring - so a simple split may be hard to achieve
  4. Murdoch

    Electric test fail.

    I guess your best next step is get a clearer picture to see if the breaker has been changed and if it has ask for the EICR to be updated Lack of continuity is a C2
  5. Murdoch

    Electric test fail.

    I think that codebreakers could be used against sparks in court as their guidance is suspect to say the least. What a mess
  6. Murdoch

    Electric test fail.

    And the several partners includes NAPIT which is madness. No respect for them
  7. Murdoch

    EICR issues

    How tall is the bathroom ceiling / light. If it’s over 2.25 m then the ip rating is incorrect so it’s not a C2 A 10A mcb on 2.5 is not a C2 Could you post a photo of the CU?
  8. Murdoch

    Electric test fail.

    Exactly. The NAPIT crew should be ashamed of themselves. They do not up hold safety, they are ONLY interested in making money
  9. Murdoch

    Electric test fail.

    NAPIT code breakers has been compiled, on the basis that pretty much all pre 18th edition installs are a fail - which of course is nonsense
  10. Murdoch

    Electric test fail.

    Ah NAPIT Code Breakers - not the most reliable reference book
  11. Murdoch

    Hi Everyone, a question

    Switching what exactly ?
  12. Murdoch

    18th Edition Amd3 DPC For Info

    If it was me reviewing this dodgy EICR I would recommend they challenge the report for over zealous coding
  13. Murdoch

    18th Edition Amd3 DPC For Info

    And the more that they "improve" the more its ignored.
  14. Murdoch

    18th Edition Amd3 DPC For Info

    and what is the customer going to do? Thats a C3 in my book
  15. Murdoch

    Hi Everyone, a question

    What do these switches and sockets control? I think that is the most important question, before drawing any conclusions. A bit unusual to say the least but may only merit a comment.
  16. Murdoch

    18th Edition Amd3 DPC For Info

    I fear for the standards going forward as the unnecessary change on unnecessary changes make more people ignore the regs.................
  17. Murdoch

    18th Edition Amd3 DPC For Info

    What a ******* mess. JPEL/64 is a stitch up including OEMs with a vested interest to make changes for profits sake. I’ve sent in comments in the past and as far as I can tell they are ignored. All they need to do is send the draft to the Plain Speaking Society for comments - then act of...
  18. Murdoch

    Being lazy

    This is the page from the latest OSG
  19. Murdoch

    Being lazy

    Can anybody give the electrics regs number that gives minimum distance between a consumer unit and a gas pipe? If there is one😉
  20. Murdoch

    Monitoring for maximum demand

    What is his typical weekly usage? I’d be really surprised if the house got anywhere near 80A unless it has electric space heating