Search results

Talk Electrician Forum

Help Support Talk Electrician Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
  1. mort2376

    Electric test fail.

    Unfortunately all the schemes appear to be just in this buisness to make money out of us. I'm a Napit member and it works for me. But would I use their coding book as definitive guide. No. Both publications are guides. If you have the relevant experience then you understand what to code what...
  2. mort2376

    Electric test fail.

    https://www.electricalsafetyfirst.org.uk/media/mi1oqkur/best-practice-guide-4-issue-7-1.pdf This is a better guide as its been worked on by several partners.
  3. mort2376

    18th Edition Amd3 DPC For Info

    If the rcbos are tripping in time then it's a C3 only thing it can be.
  4. mort2376

    18th Edition Amd3 DPC For Info

    Well they have to show that they are worth all the money we pay them 🤣
  5. mort2376

    18th Edition Amd3 DPC For Info

    Summer 2024 Amd 3 Summer 2025 19th ?????????
  6. mort2376

    18th Edition Amd3 DPC For Info

    IET and BSI urges electrical industry to have its say on IET Wiring The Institution of Engineering and Technology (IET) and BSI are calling on the electrical industry to have its say on an amendment to BS 7671:2018+A2:2022, which will go to DPC (Draft for Public Consultation) on 8 May 2024...
  7. mort2376

    Monitoring for maximum demand

    Ive used this in the past. Simple to setup and comes with software for you to get the data off. That's the company I hired from, they do deliver, but you may find a local supplier you can collect from. You don't need an energy monitor you need an energy data logger. So what your customer has...
  8. mort2376

    Quick Question

    Been called out to a school that's had a flood due to having the lead ripped off the roof. Replaced loads of panel leds due to water ingress but when testing there is no earth continuity on the cables feeding each driver and pir. They were fitted in 2019/20 by some company that used wago...
  9. mort2376

    BT Open Reach - rant time

    Yep down to whichever service provider they choose to supply the service. Depending on the area you might get a new analogue line installed but its very doubtful. Will probably end up with a fibre connection and router to provider VOIP. Even if no broadband is being supplied. If they already...
  10. mort2376

    Brain Fog

    Oven 2.4 - 3kw Micro 1.65kw
  11. mort2376

    Brain Fog

    I seem to remember being told at either a tech talk or something similar that there was a maximum rating for a fixed connected appliance that could be plugged in on a 13a socket. I know a 13a socket is 3kw but in my mind I've got 2.2kw as a maximum. I've tried looking in the BBB and OSG buy...
  12. mort2376

    Elex Show Bolton

    Agree CEF live was far better. I'm going to the fire and security show at the NEC this year as well. More freebies and cpd points lol
  13. mort2376

    Elex Show Bolton

    It was busy on Thursday till about 1230 then it thinned out.
  14. mort2376

    Elex Show Bolton

    Better attended than last year, but a few large brands missing. I think many are of the opinion that there are better deals and freebies to be had elsewhere ! So why take a morning off. I use it as my yearly pen restock as I'm forever leaving them places 🤣
  15. mort2376

    NVR networking problem

    I have a similar issue with my NVR. It won't run in chrome but does work happily in Edge or Internet explorer.
  16. mort2376

    Elex Show Bolton

    Anyone going today ?
  17. mort2376

    Which circuit is appropriate ?

    We are only discussing it here on the forum. It's all fantasy. Of course in the real world I would always contact the supplier to arrange an appointment 8 weeks in the future to sit and wait all day for the engineer to turn up. I charge the customer a waiting time similar to taxi companies for...
  18. mort2376

    Which circuit is appropriate ?

    The official line is either the customers energy supplier to fit an isolator. Which is not an urgent job so can take weeks. Or use a SIP provider. But trying to find a SIP provider isn't easy neither is finding out much about the SIP scheme !
  19. mort2376

    Which circuit is appropriate ?

    No I must admit I have looked and watched the YouTube video by efixx about it. They did say that not many companies had signed up to it. It's always going to be an us and them thing until a sparky gets injured doing it. Then they will seriously do something about it. Anytime I've cut the...
  20. mort2376

    Which circuit is appropriate ?

    They said while the calculations are old (1934) they give you a result that is acceptable. However you as the installer can determine it anyway that's sensible. Given that the power networks allow 8 amps per property for new housing estates the entire thing is a total farce !
Top