I have a small business centre i look after that requires some sub metering and splitting of supplies.
One of the units is quite large and the landlord is looking to split into separate units. It is fed single phase from main incommer, through a 100a fused isolator then 35mm swa over to the unit. The swa terminates to an adaptable box high up on the wall and splits to off to feed 2 existing consumer units in different areas of the unit. These are to be metered at current cu positions.
I need to split the supply again to feed another cu as the unit is being divided again!
So where swa splits at the moment its a large plastic adap box with henleys in it. I need a more suitable way of distributing the supply without going the route of busbar chamber which aint cheap.
(tight arse landlord!)
Cheers
One of the units is quite large and the landlord is looking to split into separate units. It is fed single phase from main incommer, through a 100a fused isolator then 35mm swa over to the unit. The swa terminates to an adaptable box high up on the wall and splits to off to feed 2 existing consumer units in different areas of the unit. These are to be metered at current cu positions.
I need to split the supply again to feed another cu as the unit is being divided again!
So where swa splits at the moment its a large plastic adap box with henleys in it. I need a more suitable way of distributing the supply without going the route of busbar chamber which aint cheap.
(tight arse landlord!)
Cheers