danny7299
Well-known member
I have been getting my job's together to register with NICEIC Domestic. And there are something is wanted to check...
The Major Job is a kitchen Extension, with bathroom and changing room above it.
Due to the way the house was laid out, I decided to run a sub feed to the Extension and run all new cables to the new Dis board. In hindsight I should have done this in SWA but I clipped 16mm T&E to the ceiling Joist before the ceiling went up. But I didn
The Major Job is a kitchen Extension, with bathroom and changing room above it.
Due to the way the house was laid out, I decided to run a sub feed to the Extension and run all new cables to the new Dis board. In hindsight I should have done this in SWA but I clipped 16mm T&E to the ceiling Joist before the ceiling went up. But I didn