I'm just curious.... :coat

Local job, consists of three parts:

1. Replace an existing faulty 2 gang dimmer

2. Install a new double socket on the same stud wall as an existing double (so basically up the stud wall, 8 feet along in the loft and drop down. socket to be sunk - drylined box. Only issue might be noggins!

3. Install new aerial socket next to new double socket - easy access in the loft to existing aerial cable that can be "tapped" into - dryline box sunk in - again only issue might be noggins!

New house (about 7 years old, all bonding, earth and RCD ok)

How long and how much (inc materials)? ?:|

O.

Link to comment
Share on other sites
 

In the region of

Link to comment
Share on other sites
 

Probably take longer than you think so at least half days work - charge accordingly.

Link to comment
Share on other sites
 

Evenin'

I was thinking 3 - 4 hours...especially if I have to cut holes and make good to deal with the noggins! (where's my hole saw) :D

I reckoned on 140 quid inc materials.

O.

Link to comment
Share on other sites
 
Evans Electric

There are always noggins.

I'd say 6 hours with test and certify. So

Link to comment
Share on other sites
 

Same as others i would be looking to say 140 / 150 based on going well.

Link to comment
Share on other sites
 
 
SPECIAL LOCATION
I'm just curious.... :coat

Local job, consists of three parts:

1. Replace an existing faulty 2 gang dimmer

Allow 10mins + cost of dimmer.

2. Install a new double socket on the same stud wall as an existing double (so basically up the stud wall, 8 feet along in the loft and drop down. socket to be sunk - drylined box. Only issue might be noggins!

Allow

1/2 hour for cut dry-line back box, terminate cables, identify circuit safe isolate etc..

1 hour up the wall

1 hour down the wall

15mins across loft & any clipping

so 2.75 hours + materials

3. Install new aerial socket next to new double socket - easy access in the loft to existing aerial cable that can be "tapped" into - dryline box sunk in - again only issue might be noggins!

Allow

1/2 hour fixing back box and terminating ends, joining to existing feed.

1 hour up wall

15mins for any clipping or any other tricky bits

so 1.75 hours + materials

New house (about 7 years old, all bonding, earth and RCD ok)

How long and how much (inc materials)? ?:|

O.

I normally think these jobs though in a mental stage by stage approach..

highlight in blue above...

so total guesstimate time would be..

10mins + 2.75hours + 1.75 hours

then round up to the next full hour..

5 hours minimum (or 1/2 day) @ whatever your labour rate are +

materials +

Link to comment
Share on other sites
 
1. Replace an existing faulty 2 gang dimmer

Allow 10mins + cost of dimmer.

Assuming it really is the dimmer itself at fault :D

Link to comment
Share on other sites
 
Assuming it really is the dimmer itself at fault :D

You mean rather than someone putting non dimmable lights on them.

Link to comment
Share on other sites
 

Archived

This topic is now archived and is closed to further replies.

×
  • Create New...

Important Information

Terms of UseWe have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.