Went to a house last week,,,,,need their new extension signing off :_|
all work done by the female owner.
first impressions were that is looked ok except for the extra cpc going to the outside socket.
they had put in a new cu fed from an existing where the cable 10mm had been istalled by a sparky.
i told her you need to ask the building inspector what cert he requires to sign the building off
the reply.......
dont need one as the wiring was done 3 years ago !!!!!!!!! headbang
clueless whats the point
good news for me as she wants 4 new lights installed so just that cct to worry about
i know full well that they are putting the house on the market as soon as it done and the question will be asked about any wiring done in the last 5 years ?
back i go for the PIR :^O
all work done by the female owner.
first impressions were that is looked ok except for the extra cpc going to the outside socket.
they had put in a new cu fed from an existing where the cable 10mm had been istalled by a sparky.
i told her you need to ask the building inspector what cert he requires to sign the building off
the reply.......
dont need one as the wiring was done 3 years ago !!!!!!!!! headbang
clueless whats the point
good news for me as she wants 4 new lights installed so just that cct to worry about
i know full well that they are putting the house on the market as soon as it done and the question will be asked about any wiring done in the last 5 years ?
back i go for the PIR :^O