RussellR
Senior Member
- Joined
- Aug 15, 2009
- Messages
- 188
- Reaction score
- 0
I have to carry out a Periodic in a large production plant, which is coming up for 17 years old, checked the previous periodic reports and on every occasion they have taken all of the mains wiring within the control system out of scope. When we do controls work we all ways test the mains wiring within our control system.
The customer wants to take it out of scope again, but even taking a quick look over it, it is not in a great state.
My feeling is that we should bring it in to scope for this inspection, what do you guys think ?, it is going to be a hard job but I know the plant well enough to carry out a meaningful test.
The customer wants to take it out of scope again, but even taking a quick look over it, it is not in a great state.
My feeling is that we should bring it in to scope for this inspection, what do you guys think ?, it is going to be a hard job but I know the plant well enough to carry out a meaningful test.