meady
Senior Member
- Joined
- Jun 19, 2009
- Messages
- 197
- Reaction score
- 0
Went to look at a cu change tonight, all looked fine and dandy until I asked where the incoming gas and water was. The water was was in the living room next the original cimney stack behind a stud wall, it had access by the way. The gas was under the sink. Anyway the problem was that the floor is solid concrete, the whole place was freshly plastered, fully tiled in the kitchen and to top it off poxy laminate flooring throughout the first floor. I can get a bond to the gas by routing the cable around the side of the house and then back into the kitchen but I havent got a scooby about the water. Is there any way around the water bond or does it have to be 10mm at 600mm from inside the house?