Thats great thank you @ Blue duck that's hit the nail on the head for me so a reading lower than 1 m ohm ie 9.99 would indicate fault etc where as 299 is perfectly fine I think the readings them selfs of 175 an 0.75 just confused me as im used to either 299 and 999 on meggas meters. Thank you
I'm wondering if you can give me some guidance regarding installation resistance readings?? So based on college learning when doing this test I was under the impression the correct reading for no faults would be 299 while 999 for a fault on the circuit but a question I have is why would I get...
Thank you apologies for taking the wrong approach new to the site all advice taken on-board and learned from my mistakes will certainty be on here for more guidance and would like to say I appreciate your honesty and paitence. Many thanks everyone to be honest had very little experience infact...
Thank you for your advice and kind words of wisdom binky I like the way you put it spot on..short course syndrome your not wrong! if I hadn't already invested so much already I would certainly have done things differently i would not advise these courses at all..none the less I'm trying to make...
No it's not homework it's a assignment it's level 3 a level on design while I have covered some of this on the level 2 what I'm covering now is alot different I have done my level 2 intense over 7 weeks and just started my level 3 the same over 7 weeks while I do appreciate your help I don't...
My names micky I'm 26 an live in Parsons green south west London currently studying a level 3 electrical installation a level course full time. I'm after some extra work experience weekends preferred but weekdays won't be turned down either, anything considered just really could do with some...
Hi thanks for replys I'm actually testing myself the question is based on a design and the question is as follows. The supply to the detached workshop has been installed using two core steel wire armoured cable. Describe the most appropriate method of testing continuity of cocktail to the...
I'm training to be a electrician.. and the swa is supplying a detached workshop I'm testing the installation I need to no how you would test continuity of the cocktail to the distribution board?
Cocktail.. #cpc
So when using 2 core steel wired armoured swa cable, what would be the most appropriate method of testing continuity of the cpc to the distribution circuit?