Search results

Talk Electrician Forum

Help Support Talk Electrician Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
  1. P

    Reading Project - New Build 300 Houses

    Electrician and improvers required in Reading Call 01992 478708 for informal chat
  2. P

    Reading Project - New Build 300 Houses

    What rates are you paying?
  3. P

    Insulation Resistance

    Thanks to all for the comments.
  4. P

    Insulation Resistance

    Both ends of flex disconnected yes.
  5. P

    Insulation Resistance

    Have just installed 20 external LED spike lights that the client has supplied. All wiring is SWA and on an 10a 30ma RCBO. All was well for a while! Called back at tripping occurring. Found that the Gardener damaged the SWA and a flex from wiska box to fitting. We returned to repair but after a...
  6. P

    Looking for job near dartford

    Have a project in Guildford that may need soom labour soon. Its second fixing 38 two bedroom apartments in a new Radisson Hotel. Are you 17th reg up and do you have your inspection and testing cert?
  7. P

    Electrical Supervisor (QS) REQUIRED in the Polegate area of East Sussex for New Build Houses and Flats

    New build project in Polegate starting. We are looking to employ an electrical supervisor to work and run the labour. Phase 1 is a one year project of new build houses and flats. Interviews being arranged for June. If this is or interest please email [email protected],
  8. P

    New shower circuit

    I would also install a 30ma RCBO as well as mechanical protection (metal capping)
  9. P

    How long do 2D lamps last

    Its all to do with the efrequency of switching. I am having problems with many projects some old some new. PIRs need to be switched to their max i.e. 30 mins as the gas in the lamp needs to be heated up by the cathodes before they switch off and on again, that takes 13.5 min otherwise it never...
Top