Search results

Talk Electrician Forum

Help Support Talk Electrician Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
  1. V

    NVQ Course online.

    Thanks for all the opinions lads, think I'll book the course on a CC and just have to py it over a couple of months. So if you're on a site in the NW in the next few months and someone asks you could you take a picture whilst he just bends this pipe. Don't run away it probably will just be me.
  2. V

    NVQ Course online.

    I am SE Deke working in domestic but also do agency work which is just usually a few weeks here and there but lately has started coming in more frequently as more companies have requested me back. I would have done the NVQ sooner or later I suppose as it is the recognised standard but...
  3. V

    NVQ Course online.

    Hi lads, have been told by JIB that I wonT be able to renew my ECS card this year unless I complete a NVQ LEVEL 3 course. I have no problem with covering any of the work it entails just wnted to know if anyone knew of any online colleges I can take it from at a reasonable rate as the only ones...
  4. V

    Settle a argument over disconnection times.

    Thanks for the replies lads. It was not the C&G test it was actually a electrical knowledge test for a job which just caused a bit of a debate in the van today. What would be the exceptions to this then as mentioned in 411.3.2.3?
  5. V

    Settle a argument over disconnection times.

    Wonder if a difference of opinion could be settled. A lad I work with was posed a question on a test "what is the maximum disconnection time in a 6a TN lighting circuit". The answer was given as 0.4 whilst I thought on that information available the answer would be 5s. ELECSA technical have...
  6. V

    EICR coding

    SL thanks for taking the time to post that detailed reply, informative as always. I think Andy has stolen my thunder with his reply. I know the Zs reading was well within permitted limits but as it was a figure that I was not expecting to much in respect to all my other results and I was...
  7. V

    EICR coding

    Used my Kewtech for Zs andmy Metrell for continuity so you could have point about the meter. Steps I think you have just solved the mystery why she has had a smile on her face all week, here's me thinking it was the flowers from the garage I bought her on Tues. ;)
  8. V

    EICR coding

    [quote name='Andy
  9. V

    EICR coding

    I am having similar problems with coding after doing my first ECR this week. I had a lighting circuit with Zs of 2.54ohm and a insulation between line and CPU of 76Mohm. On the old PIR I would have classed as needs further investigation, would it now be a C3. Thanks. Sorry for hijacking your...
  10. V

    3 word story

    While trigger saw
  11. V

    20a cooker in 32a ring

    Thanks for all the advice lads, gonna use the existing 2.5 on a 20A mcb. The reason why I had a 2.5 ring cable in was when did the first fix last week it was only supposed to be hob and small oven. As is usual I get hear today and the lady of the house has changed it to a big double one.
  12. V

    20a cooker in 32a ring

    What about if I feed the oven in 2x 2.5 mm in parallel on a 32a mcb and will leavethe other four outlets on the house ring
  13. V

    20a cooker in 32a ring

    If its rated 20a , could I take diversity into account( first 10a + 30%) and put it on a FCU. It is going to be a pain to put new feed in so just trying to explore my options. Cheers for all the swift replies. :)
  14. V

    20a cooker in 32a ring

    Just on a job adding sockets to a kitchen ring. I have noticed that the cooker switch in the ring supplying the oven is now going to be supplying a oven that will be drawing 20a max. Have not got my regs to hand so was not sure if this ok , does the oven need to be on its own circuit or will it...
  15. V

    Catering unit supply

    Lee, Steps, Andy :worship:Applaud ---------- Post Auto-Merged at 21:46 ---------- Previous post was made at 21:45 ---------- Sorry and Mega. :Applaud
  16. V

    Elecsa connect kit

    I have not been sent anything about it. :C
  17. V

    Catering unit supply

    Cheers mate this what I had in mind, anyone know a link for a decent one.
  18. V

    Catering unit supply

    Thanks for the reply Andy, if a use a 230-12 power supply would he still be in the position where he would have to hook it up to 230 once he got to where he was working. Apologies if this is stupid question just want to make sure I know what the best way to do this before I start it next week.
Top