2nd Fireplace job

Talk Electrician Forum

Help Support Talk Electrician Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Joined
Mar 9, 2008
Messages
2,022
Reaction score
56
Location
Doncaster
OK, here are some pics of the second fireplace job I was on about doing.

I was holding on before I posted because the punter said he was going to send me some more 'after' shots when he'd got wallpaper patched in and fire in place. This hasn't happened yet but I'll add them after.

Task at hand:

  • Remove gas fireplace and surround
  • Fit electric flush electric fire (higher up)
  • Run Video/Audio cables from corner of room to new TV position above fireplace
  • Wire electrics for new fire and TV positioned above fire
  • Fit skirting board

I manged to take a few shots while working but it was a very busy day to get it all done so kinda forgot about taking pics.

Before I started.

IMAG0278.jpg

Old fire out and capped.

IMAG0283.jpg

New fire to go in. Well, new to them. It was practically new, but had been stored

IMAG0282.jpg

Old insert and surround gone.

IMAG0284.jpg

Bricks in to create right size hole for electric fire. Electrics in (long drill bit and a good shot), Fish in ready for Audio/Video going in.

IMAG0285.jpg

Audio/Video in and brushed plate on, Can't tell I've been lol

IMAG0286.jpg

TV bracket up and everything second fixed at TV end

IMAG0287.jpg

Backing plaster (hardwall) and skirting on

IMAG0288.jpg

And thats as far as I got pics wise. Then it got late and mind switched off. All I did after that was skim the area and connect the fire. Put hanging bracket on fo fire but left it out for plaster to dry and to make it easier to paper.

IMAG0279.jpg

IMAG0280.jpg

IMAG0281.jpg

 

Latest posts

Top