A lesson learned on yesterday's job !
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="Andy™" data-source="post: 446284" data-attributes="member: 2012"><p>well here's mine from the other year. row of units. 1x DNO feed. i need to re-terminate &amp; reposition the SWA that comes into the unit im in and the one that then heads off to the next unit. arrange with next unit for when he's out for a few hours. 15 mins in all going well, both SWA removed from old bodge, one partly re-done about to push into new box. goes outside to van for something and the lass at the unit 2 down the other way asks if my power is off too...</p></blockquote><p></p>
[QUOTE="Andy™, post: 446284, member: 2012"] well here's mine from the other year. row of units. 1x DNO feed. i need to re-terminate & reposition the SWA that comes into the unit im in and the one that then heads off to the next unit. arrange with next unit for when he's out for a few hours. 15 mins in all going well, both SWA removed from old bodge, one partly re-done about to push into new box. goes outside to van for something and the lass at the unit 2 down the other way asks if my power is off too... [/QUOTE]
Insert quotes…
Verification
Post reply
Main Forums
Electrical Inspection & Testing Forum
A lesson learned on yesterday's job !