Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Main Forums
Electrician Talk Forum
A new build - completely without building control
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="ProDave" data-source="post: 144003" data-attributes="member: 6969"><p>This project is starting right now. I'm just back from a site visit this morning.</p><p></p><p>As I type, the first old static caravan is being dismantled. Remember it's chassis gets re used for the new building to retain it's "caravan" status, (though whether it would actually be moveable is a debatable point)</p><p></p><p>So this morning I disconnected the supply from the old caravan. The supply box is about 50 metres away and I looked inside that with the site manager. They only give a 40A supply to caravans on this site, but there are no electric showers or anything so that should be okay. On this one I'll be re using the 10mm SWA that's already there for the feed.</p><p></p><p>This is being built on an ultra tight timescale. The old 'van will be stripped to the chassis this week, and all next week the mostly prefabricated new wooden building will be erected. The following week is when I and the plumber first fix at the start of the week, the unit will then be boarded out and second fixed at the end of the week all in one hit.</p><p></p><p>It's nearly 60 miles from home, so I'll be staying on site for this one.</p><p></p><p>I'll try and take some pictures if I remember my camera.</p><p></p><p>The second unit will follow shortly afterwards. That one is already an empty plot, though looking around it I couldn't see an existing supply so might have to be trenching and laying in a new cable for that one.</p></blockquote><p></p>
[QUOTE="ProDave, post: 144003, member: 6969"] This project is starting right now. I'm just back from a site visit this morning. As I type, the first old static caravan is being dismantled. Remember it's chassis gets re used for the new building to retain it's "caravan" status, (though whether it would actually be moveable is a debatable point) So this morning I disconnected the supply from the old caravan. The supply box is about 50 metres away and I looked inside that with the site manager. They only give a 40A supply to caravans on this site, but there are no electric showers or anything so that should be okay. On this one I'll be re using the 10mm SWA that's already there for the feed. This is being built on an ultra tight timescale. The old 'van will be stripped to the chassis this week, and all next week the mostly prefabricated new wooden building will be erected. The following week is when I and the plumber first fix at the start of the week, the unit will then be boarded out and second fixed at the end of the week all in one hit. It's nearly 60 miles from home, so I'll be staying on site for this one. I'll try and take some pictures if I remember my camera. The second unit will follow shortly afterwards. That one is already an empty plot, though looking around it I couldn't see an existing supply so might have to be trenching and laying in a new cable for that one. [/QUOTE]
Insert quotes…
Verification
Post reply
Main Forums
Electrician Talk Forum
A new build - completely without building control
Top