Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Green Renewable Energy Forum
Solar PV Forum
Adding panels to existing systems
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="binky" data-source="post: 230974" data-attributes="member: 490"><p><strong>Slackbladder</strong> actually.</p><p></p><p>I'm sure I saw somewhwere that yuo can add to an installation and receive the higher tariff because it is an exisitng installation. Was doing the Energy saving trust survey yesterday, and several questions were about 'extensions' to commercial installs, and should the loop hole be closed down.</p><p></p><p>If I wanted to fiddle FiT, I would run the house electrics through the generation meter - doddle! It's not about fiddling, it's about legal loopholes and taking advantage to beat deadline. As it happens all we really need is serial number of generation meter to register for FiT</p></blockquote><p></p>
[QUOTE="binky, post: 230974, member: 490"] [B]Slackbladder[/B] actually. I'm sure I saw somewhwere that yuo can add to an installation and receive the higher tariff because it is an exisitng installation. Was doing the Energy saving trust survey yesterday, and several questions were about 'extensions' to commercial installs, and should the loop hole be closed down. If I wanted to fiddle FiT, I would run the house electrics through the generation meter - doddle! It's not about fiddling, it's about legal loopholes and taking advantage to beat deadline. As it happens all we really need is serial number of generation meter to register for FiT [/QUOTE]
Insert quotes…
Verification
Post reply
Green Renewable Energy Forum
Solar PV Forum
Adding panels to existing systems
Top