Advice needed scoping work for electrician
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="mort2376" data-source="post: 541664" data-attributes="member: 25787"><p>Electricity North West specification duct is always red and embossed 'Danger Electricity Cables', with no exceptions and should follow what is in our pack.</p><p></p><p>That is direct from their website. Also if your upgrading your supply from single to 3 phase they will do the install and connect your existing single phase meter if they are removing the old supply too.</p></blockquote><p></p>
[QUOTE="mort2376, post: 541664, member: 25787"] Electricity North West specification duct is always red and embossed 'Danger Electricity Cables', with no exceptions and should follow what is in our pack. That is direct from their website. Also if your upgrading your supply from single to 3 phase they will do the install and connect your existing single phase meter if they are removing the old supply too. [/QUOTE]