Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Green Renewable Energy Forum
Solar PV Forum
Batteries and FIT payment meter
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="michael8554" data-source="post: 543411" data-attributes="member: 34375"><p>The EPS output is probably not rated to cover the whole house load.</p><p>So "just a changeover on the incoming supply" is not the whole story.</p><p>A few crucial circuits will have to be extended to John's beefy multipole changeover switch.</p><p>With the "Normal" multipole outputs wired back to the original house CU locations.</p><p>And the "Off-Grid" multipole outputs wired to a mini CU which is fed by the EPS output.</p><p>The mini CU will require separate isolated from the grid "earthing", to protect grid workers.</p><p>The installer may only want to spend half a day on the battery install and then move onto the next lucrative install.</p></blockquote><p></p>
[QUOTE="michael8554, post: 543411, member: 34375"] The EPS output is probably not rated to cover the whole house load. So "just a changeover on the incoming supply" is not the whole story. A few crucial circuits will have to be extended to John's beefy multipole changeover switch. With the "Normal" multipole outputs wired back to the original house CU locations. And the "Off-Grid" multipole outputs wired to a mini CU which is fed by the EPS output. The mini CU will require separate isolated from the grid "earthing", to protect grid workers. The installer may only want to spend half a day on the battery install and then move onto the next lucrative install. [/QUOTE]
Insert quotes…
Verification
Post reply
Green Renewable Energy Forum
Solar PV Forum
Batteries and FIT payment meter
Top