Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Main Forums
Do-It-Yourself (DIY) Question & Answer Forum
C40A Tp Mcb, High Zs
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="apprentice87" data-source="post: 392980" data-attributes="member: 13534"><p>What does this final circuit supply and where?? are the cables buried in walls and how deep etc...</p><p></p><p>You need something to provide ADS within the required time in the event of an earth fault,, and i assume that the RCD will sort this, but what if some of the stuff supplied requires a 30mA RCD for shock protection purposes.</p><p></p><p>Also, although there is nothing in the regs about disconnection times for L/N faults, these require disconnection within 5 seconds too, as, the formulas in the regs for the heating of cables in the event of a fault are all based around a max disconnection time of 5 seconds. You can calculate what the cables will withstand for other disconnection times, and there is a BS that deals with this, but i have no idae which one and certainly have not got one.</p><p></p><p>Some of the others will no doubt give you a better answer, but they will need more information first!!</p><p></p><p>john..</p></blockquote><p></p>
[QUOTE="apprentice87, post: 392980, member: 13534"] What does this final circuit supply and where?? are the cables buried in walls and how deep etc... You need something to provide ADS within the required time in the event of an earth fault,, and i assume that the RCD will sort this, but what if some of the stuff supplied requires a 30mA RCD for shock protection purposes. Also, although there is nothing in the regs about disconnection times for L/N faults, these require disconnection within 5 seconds too, as, the formulas in the regs for the heating of cables in the event of a fault are all based around a max disconnection time of 5 seconds. You can calculate what the cables will withstand for other disconnection times, and there is a BS that deals with this, but i have no idae which one and certainly have not got one. Some of the others will no doubt give you a better answer, but they will need more information first!! john.. [/QUOTE]