Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Main Forums
Electrician Talk Forum
Cable running question
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="Dairyspark" data-source="post: 539918" data-attributes="member: 19743"><p>We/I don’t get involved in the solar install, we provide means of connection in the form of a mccb panel board and mccb and the solar and their electrical subby does everything to there. The cable I’m trying to work out is to supply one of the sheds with a 400A supply from his proposed new intake point. However if we get our way the intake point will be moved to the shed so no calculation will be needed, or not as many lol</p></blockquote><p></p>
[QUOTE="Dairyspark, post: 539918, member: 19743"] We/I don’t get involved in the solar install, we provide means of connection in the form of a mccb panel board and mccb and the solar and their electrical subby does everything to there. The cable I’m trying to work out is to supply one of the sheds with a 400A supply from his proposed new intake point. However if we get our way the intake point will be moved to the shed so no calculation will be needed, or not as many lol [/QUOTE]
Insert quotes…
Verification
Post reply
Main Forums
Electrician Talk Forum
Cable running question
Top