Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Main Forums
Electrician Talk Forum
Commercial Equipment 3 Phase Query
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="Devnet" data-source="post: 530858" data-attributes="member: 35317"><p>This is what I thought but apparently the manufacturer insists it’s spread over the phases and the same has been advised to many other units sold and setup by electricians to this and there’s never been any issues.</p><p></p><p>Issue I have is it will involve a 50 metre armoured cable wire run upgrade so I want to make sure it’s right but at the same time don’t want to have to spread considerable more than is needed to service it.</p><p></p><p>The big telling point is the advised 35mm2 supply cable in the specification. I wasn’t sure if it’s max would be 48kW when it’s first turned on and then it winds down as it heats up but suppose wouldn’t make a difference.</p></blockquote><p></p>
[QUOTE="Devnet, post: 530858, member: 35317"] This is what I thought but apparently the manufacturer insists it’s spread over the phases and the same has been advised to many other units sold and setup by electricians to this and there’s never been any issues. Issue I have is it will involve a 50 metre armoured cable wire run upgrade so I want to make sure it’s right but at the same time don’t want to have to spread considerable more than is needed to service it. The big telling point is the advised 35mm2 supply cable in the specification. I wasn’t sure if it’s max would be 48kW when it’s first turned on and then it winds down as it heats up but suppose wouldn’t make a difference. [/QUOTE]
Insert quotes…
Verification
Post reply
Main Forums
Electrician Talk Forum
Commercial Equipment 3 Phase Query
Top