Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Main Forums
Do-It-Yourself (DIY) Question & Answer Forum
Consumer Unit further than 3 metres from the metering position
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="sparkytim" data-source="post: 132870" data-attributes="member: 8627"><p>It will need Switch fuse or MCB prtection for overload / fault protection but as has been said IF SWA or in Earthed Metal Trunking then NO RCD required if TN supply.</p><p></p><p>Last one I did I fitted 100 A Switch fuse back to back with Meter box and wired from their in 3 Core 25mm SWA, which provided more then required CPC to Consumer Unit position.</p></blockquote><p></p>
[QUOTE="sparkytim, post: 132870, member: 8627"] It will need Switch fuse or MCB prtection for overload / fault protection but as has been said IF SWA or in Earthed Metal Trunking then NO RCD required if TN supply. Last one I did I fitted 100 A Switch fuse back to back with Meter box and wired from their in 3 Core 25mm SWA, which provided more then required CPC to Consumer Unit position. [/QUOTE]
Insert quotes…
Verification
Post reply
Main Forums
Do-It-Yourself (DIY) Question & Answer Forum
Consumer Unit further than 3 metres from the metering position
Top