Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Main Forums
Electrician Talk Forum
Getting involved with CU change that may not have c.p.c's for circuits?
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="DaveS79" data-source="post: 491817" data-attributes="member: 28820"><p>Wondering how you guys would approach this. Got a call from an older lady...really sweet old girl bless her. Want to try to give her a fair deal in terms of cost. She's requested a CU change and sent me photos of current wylex board. Have attached these. It's an old prefab she has and got my concerns that existing wiring doesn't include c.p.c's which she can't confirm and also whether or not bonding in place. Thinking of advising an eicr first as age of wiring and deterioration may mean circuits not complying and causing rcd trips with new install anyway. Aslong as all is well interms of c.p.c's I could get my r1+r2 results whilst doing this. What exactly is the crack anyway in terms of a DB change in this scenario? Obviously no c.p.c's not good but if customer not up for full rewire could change go ahead in thought that at least she might potentially have a safer installation </p><p></p><p>[ATTACH]10370[/ATTACH]</p><p></p><p>[ATTACH]10371[/ATTACH]</p></blockquote><p></p>
[QUOTE="DaveS79, post: 491817, member: 28820"] Wondering how you guys would approach this. Got a call from an older lady...really sweet old girl bless her. Want to try to give her a fair deal in terms of cost. She's requested a CU change and sent me photos of current wylex board. Have attached these. It's an old prefab she has and got my concerns that existing wiring doesn't include c.p.c's which she can't confirm and also whether or not bonding in place. Thinking of advising an eicr first as age of wiring and deterioration may mean circuits not complying and causing rcd trips with new install anyway. Aslong as all is well interms of c.p.c's I could get my r1+r2 results whilst doing this. What exactly is the crack anyway in terms of a DB change in this scenario? Obviously no c.p.c's not good but if customer not up for full rewire could change go ahead in thought that at least she might potentially have a safer installation [ATTACH]10370._xfImport[/ATTACH] [ATTACH]10371._xfImport[/ATTACH] [/QUOTE]
Insert quotes…
Verification
Post reply
Main Forums
Electrician Talk Forum
Getting involved with CU change that may not have c.p.c's for circuits?
Top