Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Main Forums
Part P Competent Person Self-Certification Schemes
How Many Really Inform Bulding Control..
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="Manator" data-source="post: 294353" data-attributes="member: 9561"><p>Building control work on the assumption that you will call them for inspection at critical stages, sometimes they will detail these visits prior, other times they rely on you to call them at each stage.</p><p></p><p>If your doing a first fix then call them in on your last day, they can see all cable runs and if more cables are required to be put in they will be happy that they have seen at least a sample.</p><p></p><p>The next time you would need to call them is when everything is second fixed and you have tested/ or not dependant on qualifications and payments.</p><p></p><p>Important footnote, Thanks to Sidewinder.</p><p></p><p>If you have not tested any circuit and are reliant on the inspector you do not energise any circuit, you can fix the wall plates ie sockets and switches but should not energise.</p></blockquote><p></p>
[QUOTE="Manator, post: 294353, member: 9561"] Building control work on the assumption that you will call them for inspection at critical stages, sometimes they will detail these visits prior, other times they rely on you to call them at each stage. If your doing a first fix then call them in on your last day, they can see all cable runs and if more cables are required to be put in they will be happy that they have seen at least a sample. The next time you would need to call them is when everything is second fixed and you have tested/ or not dependant on qualifications and payments. Important footnote, Thanks to Sidewinder. If you have not tested any circuit and are reliant on the inspector you do not energise any circuit, you can fix the wall plates ie sockets and switches but should not energise. [/QUOTE]