Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Main Forums
Electrician Talk Forum
Intake position of an installation
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="green-hornet" data-source="post: 81031" data-attributes="member: 2683"><p>Slightly vague as to what you are asking, however here goes.</p><p></p><p>Main supply cables provided by the dno.</p><p></p><p>Suitable fuses for the main cables, single phase = 1 fuse ,3 phase = 3 fuses.</p><p></p><p>Earth link if provided for by the dno.</p><p></p><p>All fuse housing and dno provided equipment to be sealed.</p><p></p><p>Short link from the main supply to a meter supplied and fitted by the energy company and sealed.</p><p></p><p>All this is the responsibility of the dno and supply company.</p><p></p><p>After the meter its the customers responsibility, however there have been pressure for all dno and supply companies to provide a suitable isolator, but this is not always present.</p><p></p><p>So in short, you would expect A, a supply to the required or design demand, B, a means of earthing, C, a method of protection for the supply prior to the home.</p><p></p><p>D, a means of safe disconnection from supply in the event of fault.</p><p></p><p>I hope that is along the lines of what you are asking.</p></blockquote><p></p>
[QUOTE="green-hornet, post: 81031, member: 2683"] Slightly vague as to what you are asking, however here goes. Main supply cables provided by the dno. Suitable fuses for the main cables, single phase = 1 fuse ,3 phase = 3 fuses. Earth link if provided for by the dno. All fuse housing and dno provided equipment to be sealed. Short link from the main supply to a meter supplied and fitted by the energy company and sealed. All this is the responsibility of the dno and supply company. After the meter its the customers responsibility, however there have been pressure for all dno and supply companies to provide a suitable isolator, but this is not always present. So in short, you would expect A, a supply to the required or design demand, B, a means of earthing, C, a method of protection for the supply prior to the home. D, a means of safe disconnection from supply in the event of fault. I hope that is along the lines of what you are asking. [/QUOTE]