Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Main Forums
Do-It-Yourself (DIY) Question & Answer Forum
job
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="avinalarf" data-source="post: 74267" data-attributes="member: 631"><p>Hello all</p><p></p><p>Went to look at a job today (finally!). Client just wants 2 bathroom spots relocated (and new fittings provided) and an external light fitted.</p><p></p><p>I'm ok with what needs doing and the fact that they're notifiable works. I'm not sure about what I'm obliged to do...</p><p></p><p>She's got an old re-wireable fuseboard on a PME system. I saw NO sign of an RCD anywhere. Bonding was in place to gas and water, although gas was only 6mm.</p><p></p><p>She said she'd had the shower replaced last year, but that no wiring was done - it was just a straight swap.</p><p></p><p>I thought there might be an RCD to cover the shower cct in the loft space above - then I put my brain back in and thought that that would be the most ridiculous place to have one Blushing.</p><p></p><p>Just need some guidance (again) on anything compulsory I'd need to do before the required work and anything else I should have looked at/for.</p><p></p><p>BTW, I was going to run the external fitting from an fcu on the downstairs ring.</p><p></p><p>Thank you.</p></blockquote><p></p>
[QUOTE="avinalarf, post: 74267, member: 631"] Hello all Went to look at a job today (finally!). Client just wants 2 bathroom spots relocated (and new fittings provided) and an external light fitted. I'm ok with what needs doing and the fact that they're notifiable works. I'm not sure about what I'm obliged to do... She's got an old re-wireable fuseboard on a PME system. I saw NO sign of an RCD anywhere. Bonding was in place to gas and water, although gas was only 6mm. She said she'd had the shower replaced last year, but that no wiring was done - it was just a straight swap. I thought there might be an RCD to cover the shower cct in the loft space above - then I put my brain back in and thought that that would be the most ridiculous place to have one Blushing. Just need some guidance (again) on anything compulsory I'd need to do before the required work and anything else I should have looked at/for. BTW, I was going to run the external fitting from an fcu on the downstairs ring. Thank you. [/QUOTE]
Insert quotes…
Verification
Post reply
Main Forums
Do-It-Yourself (DIY) Question & Answer Forum
job
Top