Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Green Renewable Energy Forum
Solar PV Forum
New installation
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="Bob Smith" data-source="post: 529135" data-attributes="member: 35176"><p>Typical houses will be on a single phase. This means that the DNO will only authorize (without asking for a special authorisation) to install a microgeneration system that will not exceed the power of a single phase ie 16A x 230V = 3.68kW.</p><p>In your paperwork you should have received a copy of the G68 form and/or MSC certification that will state the declared power of the system.</p><p></p><p>Therefore if your system is to comply with the requirement (not to ask for special authorisation) it must stay within the limit.</p><p>In other words your system has been oversized (which is not a bad thing) but will cap the power to this limit.</p><p></p><p>Hope this helps.</p></blockquote><p></p>
[QUOTE="Bob Smith, post: 529135, member: 35176"] Typical houses will be on a single phase. This means that the DNO will only authorize (without asking for a special authorisation) to install a microgeneration system that will not exceed the power of a single phase ie 16A x 230V = 3.68kW. In your paperwork you should have received a copy of the G68 form and/or MSC certification that will state the declared power of the system. Therefore if your system is to comply with the requirement (not to ask for special authorisation) it must stay within the limit. In other words your system has been oversized (which is not a bad thing) but will cap the power to this limit. Hope this helps. [/QUOTE]
Insert quotes…
Verification
Post reply
Green Renewable Energy Forum
Solar PV Forum
New installation
Top