Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Main Forums
Electrician Talk Forum
Next time....I must remember
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="kme" data-source="post: 277526" data-attributes="member: 113"><p>That when installing 2.5 metres of 70mm 4 core SWA between two DBs, with a wall in the way, at night ; it would be advisable to have some really strong people (lots of `em) to put a bend in the cable, so you can dress it into the second gland !!!!!</p><p></p><p>Only took 2.5 hrs of the night - 6 hr shutdown which required:</p><p></p><p>1. Removal of old Dorman 8 way TPN</p><p></p><p>2. Run 10 metres of 25mm 4 core SWA from existing DB to location of new DB (2.5 metres up).</p><p></p><p>3. Install new 12 way DB.</p><p></p><p>4. Reinstate pre-existing circuits.</p><p></p><p>5. Terminate both SWAs to new DB</p><p></p><p>6. Get 70mm through wall, cut to length, dressed off, and into side of switchfuse.</p><p></p><p>7. Test &amp; power back up before Chef &amp; assistants arrive at 7.15 a.m.</p><p></p><p> :coffee <img src="data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///yH5BAEAAAAALAAAAAABAAEAAAIBRAA7" class="smilie smilie--sprite smilie--sprite26" alt=":coffee:" title="Coffee :coffee:" loading="lazy" data-shortname=":coffee:" />coffee:yawn:z</p></blockquote><p></p>
[QUOTE="kme, post: 277526, member: 113"] That when installing 2.5 metres of 70mm 4 core SWA between two DBs, with a wall in the way, at night ; it would be advisable to have some really strong people (lots of `em) to put a bend in the cable, so you can dress it into the second gland !!!!! Only took 2.5 hrs of the night - 6 hr shutdown which required: 1. Removal of old Dorman 8 way TPN 2. Run 10 metres of 25mm 4 core SWA from existing DB to location of new DB (2.5 metres up). 3. Install new 12 way DB. 4. Reinstate pre-existing circuits. 5. Terminate both SWAs to new DB 6. Get 70mm through wall, cut to length, dressed off, and into side of switchfuse. 7. Test & power back up before Chef & assistants arrive at 7.15 a.m. :coffee :coffee:coffee:yawn:z [/QUOTE]
Insert quotes…
Verification
Post reply
Main Forums
Electrician Talk Forum
Next time....I must remember
Top