Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Green Renewable Energy Forum
Solar PV Forum
ProjectSolar, Solar Plants, conflicting advice
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="ProDave" data-source="post: 480210" data-attributes="member: 6969"><p>The limit for G83/2 which is where you have a right to install the system and notify the DNO afterwards is actually 3.86KW. But it is normal to fit 4KW of panels with a type approved inverter that limits the output to no more than 3.68Kw. You can fit this without asking and notify the DNO afterwards. Since you have 2 meters, you would in fact be fitting 2 separate systems and notifying two G83/2 installations each limited to 3.68Kw</p><p></p><p>The one flaw I see in the proposal with such a split system (and they MUST be completely split) is you would need TWO battery packs and 2 inverter / chargers.</p><p></p><p>That is a lot of money you are spending. You will get the now very small FIT IF YOU ARE VERY QUICK but otherwise would be relying on self usage to pay for it. Have you done any return on investment sums? </p></blockquote><p></p>
[QUOTE="ProDave, post: 480210, member: 6969"] The limit for G83/2 which is where you have a right to install the system and notify the DNO afterwards is actually 3.86KW. But it is normal to fit 4KW of panels with a type approved inverter that limits the output to no more than 3.68Kw. You can fit this without asking and notify the DNO afterwards. Since you have 2 meters, you would in fact be fitting 2 separate systems and notifying two G83/2 installations each limited to 3.68Kw The one flaw I see in the proposal with such a split system (and they MUST be completely split) is you would need TWO battery packs and 2 inverter / chargers. That is a lot of money you are spending. You will get the now very small FIT IF YOU ARE VERY QUICK but otherwise would be relying on self usage to pay for it. Have you done any return on investment sums? [/QUOTE]