Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Green Renewable Energy Forum
Solar PV Forum
Solar immersion optimiser fitted
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="johnb2713" data-source="post: 536351" data-attributes="member: 35153"><p>This is sounding very complicated for a simple task. Surely an amount of headroom to stop it triggering as the inverter hunts around zero. When export is seen the current to the immersion is increased until the export is back to the small headroom allowance. It the adjusts the immersion current up or down as required when the conditions change.</p><p></p><p>In Myenergi EDDI it has the following settings, I assume the OP's unit must have similar?</p><p></p><p>Export Margin: Minimum level of export power which is maintained when eddi is diverting surplus power </p><p>Exp Threshold: Level of export which must be seen before the eddi will start diverting power to the heater </p><p>Response Delay: Time before the eddi starts diverting after Exp Threshold is exceeded</p><p></p><p>From a programming perspective, these three parameters are essential to get correct operation of a diverter.</p></blockquote><p></p>
[QUOTE="johnb2713, post: 536351, member: 35153"] This is sounding very complicated for a simple task. Surely an amount of headroom to stop it triggering as the inverter hunts around zero. When export is seen the current to the immersion is increased until the export is back to the small headroom allowance. It the adjusts the immersion current up or down as required when the conditions change. In Myenergi EDDI it has the following settings, I assume the OP's unit must have similar? Export Margin: Minimum level of export power which is maintained when eddi is diverting surplus power Exp Threshold: Level of export which must be seen before the eddi will start diverting power to the heater Response Delay: Time before the eddi starts diverting after Exp Threshold is exceeded From a programming perspective, these three parameters are essential to get correct operation of a diverter. [/QUOTE]