Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Main Forums
Do-It-Yourself (DIY) Question & Answer Forum
Tail upgrade unconventional set up
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="Dal Roberts" data-source="post: 439380" data-attributes="member: 24920"><p>Been to look at a job, the property is a 1st floor flat 3 bed , the service head is situated downstairs in communal external meter cupboard with 16mm tails (standard tails not PYRO 10mm which I have seen before) rising to the flats CU more than 3 metres away to board which is a BS3036 board, customer requires a 10.5kw supply for new shower, they don't want to spend out on a new board and the only way I would be able to offer install under section701 would be to henley block at the CU in flat itself and feed the existing BS3036 and fit alongside the BS3036 a shower CU 50amp with 30ma RCD, in this situation surely the tails would need to be upgraded to 25mm and the max of 3 metres rule would also apply, any suggestions would be appreciated </p></blockquote><p></p>
[QUOTE="Dal Roberts, post: 439380, member: 24920"] Been to look at a job, the property is a 1st floor flat 3 bed , the service head is situated downstairs in communal external meter cupboard with 16mm tails (standard tails not PYRO 10mm which I have seen before) rising to the flats CU more than 3 metres away to board which is a BS3036 board, customer requires a 10.5kw supply for new shower, they don't want to spend out on a new board and the only way I would be able to offer install under section701 would be to henley block at the CU in flat itself and feed the existing BS3036 and fit alongside the BS3036 a shower CU 50amp with 30ma RCD, in this situation surely the tails would need to be upgraded to 25mm and the max of 3 metres rule would also apply, any suggestions would be appreciated [/QUOTE]
Insert quotes…
Verification
Post reply
Main Forums
Do-It-Yourself (DIY) Question & Answer Forum
Tail upgrade unconventional set up
Top