Testing Extraneous Council Block?
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="Sidewinder" data-source="post: 393545" data-attributes="member: 9512"><p>Don't use 1kV for a start, no need, and no reason to on any domestic or commercial, including 3ph.</p><p></p><p>Ref: GN3 Table 2.2, been the same since the 16th bar the change in minimum requirements.</p><p></p><p>You should only be using 500V, and this would be limited to 10mV anyway.</p><p></p><p>However, I do appreciate your concern about the energy going into the communal gas supply.</p><p></p><p>Be back later.</p></blockquote><p></p>
[QUOTE="Sidewinder, post: 393545, member: 9512"] Don't use 1kV for a start, no need, and no reason to on any domestic or commercial, including 3ph. Ref: GN3 Table 2.2, been the same since the 16th bar the change in minimum requirements. You should only be using 500V, and this would be limited to 10mV anyway. However, I do appreciate your concern about the energy going into the communal gas supply. Be back later. [/QUOTE]