Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Main Forums
Part P Competent Person Self-Certification Schemes
Third Party Certification
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="DuaneMHunt1976" data-source="post: 392334" data-attributes="member: 26226"><p>So is 3rd Party basically doing the job of building control.</p><p></p><p>I figured its for "DIY" and Guys who used to do Electricals whom dont have qualifications (last time i said that, i got screamed at) </p><p>Guy pointed out that you have to really watch each bit of the install</p><p></p><p>Look at the Plans</p><p></p><p>Check the wiring before sealing</p><p></p><p>Then Testing when all done.</p><p></p><p>A Big Company wouldnt have a guy hanging around waiting for test, they would just let them install the wiring and then send the guy around for a quick test.</p><p></p><p>Also told by a NAPIT Asse, that there is NO PAPER WORK FOR IT, i did figure than the Multi Sign Form would suit it, the DIYer as the Designer and the Installer and you as the Tester!.</p><p></p><p>The 3rd Party has been around since 2011 i think (its in Part P) but still not much has been done., and its goverment pushing for this.</p></blockquote><p></p>
[QUOTE="DuaneMHunt1976, post: 392334, member: 26226"] So is 3rd Party basically doing the job of building control. I figured its for "DIY" and Guys who used to do Electricals whom dont have qualifications (last time i said that, i got screamed at) Guy pointed out that you have to really watch each bit of the install Look at the Plans Check the wiring before sealing Then Testing when all done. A Big Company wouldnt have a guy hanging around waiting for test, they would just let them install the wiring and then send the guy around for a quick test. Also told by a NAPIT Asse, that there is NO PAPER WORK FOR IT, i did figure than the Multi Sign Form would suit it, the DIYer as the Designer and the Installer and you as the Tester!. The 3rd Party has been around since 2011 i think (its in Part P) but still not much has been done., and its goverment pushing for this. [/QUOTE]
Insert quotes…
Verification
Post reply
Main Forums
Part P Competent Person Self-Certification Schemes
Third Party Certification
Top