Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Main Forums
Electrician Talk Forum
To Bond or not too Bond??
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="Sidney" data-source="post: 462922" data-attributes="member: 30039"><p>I would bond the utilities as normal within each property and also the building fabric. Basically bringing the whole property to the same potential.</p><p></p><p>Under fault conditions there is the potential for the whole system to become live however with the size of the building and it's construction tied in with lightning protection the touch voltages would be minimal for a very short duration. Not forgetting nearly everything will normally be put on some form of RCD.</p><p></p><p>As for the LP, as long as the building services have surge protection at each point of entry then I can't see any issues. Also I would consider adding SP to each flat DB to create their own zones within the building.</p></blockquote><p></p>
[QUOTE="Sidney, post: 462922, member: 30039"] I would bond the utilities as normal within each property and also the building fabric. Basically bringing the whole property to the same potential. Under fault conditions there is the potential for the whole system to become live however with the size of the building and it's construction tied in with lightning protection the touch voltages would be minimal for a very short duration. Not forgetting nearly everything will normally be put on some form of RCD. As for the LP, as long as the building services have surge protection at each point of entry then I can't see any issues. Also I would consider adding SP to each flat DB to create their own zones within the building. [/QUOTE]