Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
General Forums
General Chat Area
Ufh And By-Pass Pump
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="steptoe" data-source="post: 300318" data-attributes="member: 7"><p>this guy actually wants a proper panel fitted, [uH3 ? ]</p><p></p><p>problem is, the way it is currently wired Im not seeing any benefit [apart from tidying it up], unless I pull in some more cables, and the plumber fits some zone valves,</p><p></p><p>3 floors, manifold and mess of wires on each floor, currently all thats been wired is a 3core from Boiler linked between each floor, L N &amp; Sw , then the stats for each floor are bodged into this box,</p><p></p><p>so, am I right in thinking I really need a clock for each floor wired to a zone valve for the floor to have this done properly?</p><p></p><p>and, as Its one pipe T'd to manifolds on basement and ground I'd need a mid position on those, basement mid controlled from ground and 1st, ground mid controlled from 1st.</p><p></p><p>that might actually be doable using the 3rd core I already have at each manifold,</p><p></p><p>or can someone see a massive flaw in my thinking?</p></blockquote><p></p>
[QUOTE="steptoe, post: 300318, member: 7"] this guy actually wants a proper panel fitted, [uH3 ? ] problem is, the way it is currently wired Im not seeing any benefit [apart from tidying it up], unless I pull in some more cables, and the plumber fits some zone valves, 3 floors, manifold and mess of wires on each floor, currently all thats been wired is a 3core from Boiler linked between each floor, L N & Sw , then the stats for each floor are bodged into this box, so, am I right in thinking I really need a clock for each floor wired to a zone valve for the floor to have this done properly? and, as Its one pipe T'd to manifolds on basement and ground I'd need a mid position on those, basement mid controlled from ground and 1st, ground mid controlled from 1st. that might actually be doable using the 3rd core I already have at each manifold, or can someone see a massive flaw in my thinking? [/QUOTE]
Insert quotes…
Verification
Post reply
General Forums
General Chat Area
Ufh And By-Pass Pump
Top