Yep. I was looking in the meter box wondering where the skinny green cable went, I found out when I took the old board off . I reckon this bodge was done about 25 years ago when the kitchen was fitted. Someone else has run a 10mm shower cable and 10mm earth bond since then, no doubt thinking the main earth was up to spec.I take it the choc block was pushed back through the hole so to a casual observer you would not see it or the old cable (unless you looked in the meter box)
Enter your email address to join: