Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Green Renewable Energy Forum
Solar PV Forum
Included a meter in a new PV installation with backup AC?
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="SolarChris" data-source="post: 535653" data-attributes="member: 35786"><p>I understand it is normal to include a meter separate to an inverter in a new solar panel system but with modern inverters providing metering information how useful is it?</p><p></p><p>If I understand it correctly when using a inverter with backup AC, would you not need two meters as any PV power used by the circuits connected to the AC backup would not be being measured.</p><p></p><p>Also can a bypass switch be installed to power the critical load in case the inverter fails or needs to be removed.</p><p></p><p>I've not seen any 'switch over' power switches!</p><p></p><p>I've attached a schematic of what I propose the electrician to fit.</p><p></p><p>Any thoughts very gratefully received.</p></blockquote><p></p>
[QUOTE="SolarChris, post: 535653, member: 35786"] I understand it is normal to include a meter separate to an inverter in a new solar panel system but with modern inverters providing metering information how useful is it? If I understand it correctly when using a inverter with backup AC, would you not need two meters as any PV power used by the circuits connected to the AC backup would not be being measured. Also can a bypass switch be installed to power the critical load in case the inverter fails or needs to be removed. I've not seen any 'switch over' power switches! I've attached a schematic of what I propose the electrician to fit. Any thoughts very gratefully received. [/QUOTE]
Insert quotes…
Verification
Post reply
Green Renewable Energy Forum
Solar PV Forum
Included a meter in a new PV installation with backup AC?