Included a meter in a new PV installation with backup AC?

Talk Electrician Forum

Help Support Talk Electrician Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

SolarChris

Member
Joined
Nov 12, 2022
Messages
14
Reaction score
3
Location
Sussex Coast
I understand it is normal to include a meter separate to an inverter in a new solar panel system but with modern inverters providing metering information how useful is it?

If I understand it correctly when using a inverter with backup AC, would you not need two meters as any PV power used by the circuits connected to the AC backup would not be being measured.

Also can a bypass switch be installed to power the critical load in case the inverter fails or needs to be removed.

I've not seen any 'switch over' power switches!

I've attached a schematic of what I propose the electrician to fit.

Any thoughts very gratefully received.
 

Attachments

  • screen.jpg
    screen.jpg
    34.8 KB · Views: 0

Latest posts

Top