Bonding seems to be a happy subject so here is a little question for you all.
I have been asked to T&I a commercial building and have been over for a quick look at it before I submit a price. As I looked at the incomer and mains board I noticed the main bonding conductor (singular, 10mm2) so I followed the route. At the end was the gas AND water main, the bond went to the gas then to the water, is this allowed or should they be separate?
I have been asked to T&I a commercial building and have been over for a quick look at it before I submit a price. As I looked at the incomer and mains board I noticed the main bonding conductor (singular, 10mm2) so I followed the route. At the end was the gas AND water main, the bond went to the gas then to the water, is this allowed or should they be separate?