Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Green Renewable Energy Forum
Solar PV Forum
New Battery Installation
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Talk Electrician Forum:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="wgoldie" data-source="post: 550815" data-attributes="member: 36828"><p>As far as I am aware, there should be no effect on my current SEG. Existing PV system, installed by a MCS contractor has not been altered. SP Networks have approved an export up to 8kW (not likely to get even close to that). At the moment I have set the Victron for no export therefore the max I can export would be the 3.6kW from the PV.</p></blockquote><p></p>
[QUOTE="wgoldie, post: 550815, member: 36828"] As far as I am aware, there should be no effect on my current SEG. Existing PV system, installed by a MCS contractor has not been altered. SP Networks have approved an export up to 8kW (not likely to get even close to that). At the moment I have set the Victron for no export therefore the max I can export would be the 3.6kW from the PV. [/QUOTE]
Insert quotes…
Verification
Post reply
Green Renewable Energy Forum
Solar PV Forum
New Battery Installation
Top