Hi,
I’ve just joined the forum because I would like some help and info if possible on getting my already installed 3 phase supply connected. I have a connection date in 5 weeks and I need to have the equipment mounted and ready for that date. All things ‘downstream’ of the consumer unit can be finished later.
I’ll try to attach a pic of the incoming supply. If I could then get in order the stuff I’d need that would be great.
Thanks in advance,
Dave.
I’ve just joined the forum because I would like some help and info if possible on getting my already installed 3 phase supply connected. I have a connection date in 5 weeks and I need to have the equipment mounted and ready for that date. All things ‘downstream’ of the consumer unit can be finished later.