Recent content by retiredsparky

Talk Electrician Forum

Help Support Talk Electrician Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
  1. R

    Am2 Lighting Circuit Fail

    Tutor yes for 36 yrs another 6 yrs as a assessor for can't say who for!!!!. The real world and NET are so far apart; will they ever meet I think not. So to pass your assessment do as they say and when passed do as your boss says.
  2. R

    Am2 Question

    12 way 3-phase dist-board. Circuit 1 spare circiut 2 Co2   circuit 3 lighting circuit 4,5,6, 16amp cammando socket circuit 7 ring circuit circuit 8 heating circuit 9 spare circuit 10,11,12 dol starter. Calculate motor overload= convert W to kw/by 3 then by 230 multiply answer by 110%...
  3. R

    Am2 Urgent Help.

    It could if section A, termination of the 4core swa, or earth attachment from the banjo within the dist-board or earth attachment within the 25amp isolator. Wrong size cable from the 25amp isolator to the 16amp 5pin socket [line and cpc sizes].  The AM2 assessor should have given you feedback...
  4. R

    Am2 Lighting Circuit Fail

    Lighting circuit is wired as follows: feed to switch 5 [6242y],[ feed to light from switch 5 6242y], then 3core and earth [6243y] between switches 6 and 7. CPC terminations and any others within switch back boxes must be completed with screwless connectors.Donot forget table 51 eg colours for...
  5. R

    AM2 assement - what are the requirements to enroll

    The self assessment check list is mandatory from April this year and has to be signed by the candidate and/or the employer or training provider.
  6. R

    A couple of AM2 questions.

    Live testing: Test mains polarity and phase sequence. Test Ze: remove main earth test between L1 N +E, L2 N+E, L3 N +E record highest value as Ze. Re connect main earth and test for PEFC and note the three readings then test for PSCC and note three readings. take the highest reading and double...
  7. R

    Am2 - Lighting Circuit

    Lighting circuit: Twin and earth [6242y] from DB to first two-way switch. Twin and earth [6242y] from first two-way switch to light. Interlink first two-way switch to intermediate switch with three-core and earth [6243y] and also between the intermediate switch and the last two-way switch...
  8. R

    The New AM2 - Fault Finding Help

    The Four wiring faults are: 1. Short cct 2. Open cct 3. Cross connection 4. High resistance
  9. R

    am2 fault finding

    Section C has changed: now 2.5hrs more items to safely isolate.
  10. R

    AM2 Testing 3 phase motor

    Zs for motor cct see page 76 GN3.
  11. R

    New AM2

    Candidates for the new am2, beware of this information as some of it is incorrect.
  12. R

    AM2

    The new am2 has four assessments[sections] A,B,C & D. Assessment A is further split into two sections A1 includes Risk Assessment and Safe Isolation of the rig assigned to you, time allowed 1 hour. Section A is your composite installation, time allowed 8.5hrs. Section B is, Inspection...
  13. R

    Interchangeable MCB'S RCD'S Etc ( What Fits? )

    What happens to the conformity certificate?
  14. R

    Fault Finding - Motor circ/S-plan

    Faults are: open cct, shortc cct, cross connection and high resistance. Use the meter on the ohm's setting not on the buzz. 1. usually feed to green button swtich. 2. keep meter on ohms should read 2.5 ohms for high resistance. 4. faulty valve yes you right no equipment faults only wiring...
  15. R

    Fault Finding - Motor circ/S-plan

    Fault one: open cct feed to start switch inside DOL. Fault two: open cct or high resistance in bonding. Fault three: L/E fault on feed to circulator [pump]. Fault four: Motorized valve micro switch faulty.
Top