Leaving aside cost and practicality which usually comes up,
Table F4(1) in the OSG for single core cable gives a current capacity of 21A for 3 or 4 cables at 2.5mm square using method B at 3 phase. It doesnt give a single phase rating.
It does give one for 2 cables (24A), what am I missing?
I want to run two supplies of 2.5mm square single cable therefore 6 cables at single phase.
Any help appreciated.
Table F4(1) in the OSG for single core cable gives a current capacity of 21A for 3 or 4 cables at 2.5mm square using method B at 3 phase. It doesnt give a single phase rating.
It does give one for 2 cables (24A), what am I missing?
I want to run two supplies of 2.5mm square single cable therefore 6 cables at single phase.
Any help appreciated.