The following displays why builders should stick to shoveling muck off of a board & buttering up bricks.
Ok so it's only a board to supply things while they are building...............even so rough as.....+ no thought to where the board will be on final install, you cant see it but the front door will open on to it............I see trouble ahead :slap
http://i83.photobucket.com/albums/j293/gazjothomas/IMG_20140413_173042_zpsdf705dc4.jpg
So what do you do when you clatter the brick into the cavity when putting in back boxes? Sand & cement to re-seat the brick.....Nope
http://i83.photobucket.com/albums/j293/gazjothomas/IMG_20140413_173024_zps225188b6.jpg :facepalm:
So you've got a two storey new build attached to an existing property, rather than running cables round the ceiling void through the joist, you decide to run down stairs circuits in the (yet to be laid) screed.........not a problem just need to place the cables in conduit?
Que builders idea of conduit.
http://i83.photobucket.com/albums/j293/gazjothomas/IMG_20140413_172803_zpsb46ce20c.jpg
http://i83.photobucket.com/albums/j293/gazjothomas/IMG_20140413_172751_zps18d6a29b.jpg
http://i83.photobucket.com/albums/j293/gazjothomas/IMG_20140413_172748_zps250fa523.jpg
http://i83.photobucket.com/albums/j293/gazjothomas/IMG_20140413_172409_zps1872681a.jpg
So how do you connect waste pipe as conduit to a back box........................No need that's what capping is for.
http://i83.photobucket.com/albums/j293/gazjothomas/IMG_20140413_172335_zps310371d6.jpg
http://i83.photobucket.com/albums/j293/gazjothomas/IMG_20140413_172341_zps9772268e.jpg
How do you get cables round an RSJ.....Just drill it with a small hole.
http://i83.photobucket.com/albums/j293/gazjothomas/IMG_20140413_172553_zps48701bd9.jpg
Love the loop over the RSJ to the right.
http://i83.photobucket.com/albums/j293/gazjothomas/IMG_20140413_172538_zps0a0c9070.jpg
Or pull them through a very tight gap.
http://i83.photobucket.com/albums/j293/gazjothomas/IMG_20140413_172446_zps5880568d.jpg
At this point I had to put the camera away as the neighbor turned up :innocent , but I'm waiting to see what they do for the cooker, there seems to be a 6mm T/E circuit (I assume for cooker) That looks like it will terminate above worktop level (Plaster board fitted already) at a switch.................they seem to have forgotten to drop to below the worktop level for an outlet :Applaud
I will get back in once the internal walls up, should be interesting as they haven't left any way to get sockets& switches on any internal walls :coat
I wonder what the select committee would make of that little lot with regard to part Pee
Ok so it's only a board to supply things while they are building...............even so rough as.....+ no thought to where the board will be on final install, you cant see it but the front door will open on to it............I see trouble ahead :slap
http://i83.photobucket.com/albums/j293/gazjothomas/IMG_20140413_173042_zpsdf705dc4.jpg
So what do you do when you clatter the brick into the cavity when putting in back boxes? Sand & cement to re-seat the brick.....Nope
http://i83.photobucket.com/albums/j293/gazjothomas/IMG_20140413_173024_zps225188b6.jpg :facepalm:
So you've got a two storey new build attached to an existing property, rather than running cables round the ceiling void through the joist, you decide to run down stairs circuits in the (yet to be laid) screed.........not a problem just need to place the cables in conduit?
Que builders idea of conduit.
http://i83.photobucket.com/albums/j293/gazjothomas/IMG_20140413_172803_zpsb46ce20c.jpg
http://i83.photobucket.com/albums/j293/gazjothomas/IMG_20140413_172751_zps18d6a29b.jpg
http://i83.photobucket.com/albums/j293/gazjothomas/IMG_20140413_172748_zps250fa523.jpg
http://i83.photobucket.com/albums/j293/gazjothomas/IMG_20140413_172409_zps1872681a.jpg
So how do you connect waste pipe as conduit to a back box........................No need that's what capping is for.
http://i83.photobucket.com/albums/j293/gazjothomas/IMG_20140413_172335_zps310371d6.jpg
http://i83.photobucket.com/albums/j293/gazjothomas/IMG_20140413_172341_zps9772268e.jpg
How do you get cables round an RSJ.....Just drill it with a small hole.
http://i83.photobucket.com/albums/j293/gazjothomas/IMG_20140413_172553_zps48701bd9.jpg
Love the loop over the RSJ to the right.
http://i83.photobucket.com/albums/j293/gazjothomas/IMG_20140413_172538_zps0a0c9070.jpg
Or pull them through a very tight gap.
http://i83.photobucket.com/albums/j293/gazjothomas/IMG_20140413_172446_zps5880568d.jpg
At this point I had to put the camera away as the neighbor turned up :innocent , but I'm waiting to see what they do for the cooker, there seems to be a 6mm T/E circuit (I assume for cooker) That looks like it will terminate above worktop level (Plaster board fitted already) at a switch.................they seem to have forgotten to drop to below the worktop level for an outlet :Applaud
I will get back in once the internal walls up, should be interesting as they haven't left any way to get sockets& switches on any internal walls :coat
I wonder what the select committee would make of that little lot with regard to part Pee