Hey guys.
Good news and bad news this week.
I took the week off to get the solar install done, but thanks to having to waste 2.5 days putting noggins in the loft for the roof hooks to fasten to, I've failed.
I did get the front roof done, and all the wiring for both roofs down to the inverters. Still need to wire the inverters up though.
Anyway, back to my post.