Hi all,
I performed an EICR recently and wanted some advice.
While inspecting the service head, I noted a couple of things on the service head.
1. the meter tails (distributor side), from the service head to the meter appeared undersized.
2. the main bonding did not look installed professionally - I know the connection is good as I tested Zs on the circuits however the whole install looks shoddy on the DNO side.
The property is a 3 bed flat - the DB is 2 floors up so quite a tricky run from the Service Head but that shouldn't stop them!
Anyway, I just wanted to see if anyone has come across a similar situation and what they did about it, if anything.
Cheers,
Lucky
I performed an EICR recently and wanted some advice.
While inspecting the service head, I noted a couple of things on the service head.
1. the meter tails (distributor side), from the service head to the meter appeared undersized.
2. the main bonding did not look installed professionally - I know the connection is good as I tested Zs on the circuits however the whole install looks shoddy on the DNO side.
The property is a 3 bed flat - the DB is 2 floors up so quite a tricky run from the Service Head but that shouldn't stop them!
Anyway, I just wanted to see if anyone has come across a similar situation and what they did about it, if anything.
Cheers,
Lucky